top of page

Glulam connectors have arrived!

Updated: Jun 17, 2022

15th June 2022

The CLT spacer blocks have been arrived from Timberpoint factory!

These connectors are going to bind the 2 wall layers and support the horizontal beams. We made a special jig with metal workshop master beforehand. We unpacked the materials and started to make holes of 8 type variations. More than 100 pieces are going to be drilled. The variety of holes made us a bit confuse but we are going ahead with nice teamwork😊 Drill master has very good assistants these days.










Comments


bottom of page