Columns are installed!!
Updated: Sep 23, 2022
23rd September 2022
Early in the morning we met a crane truck driver and explained how to install the 8 columns in total for 4 corners. It was wonderful to see her experienced crane operating skill and the columns are finally on the right place after flying in the sky😲 We fastened the washers and nuts after fitting by crane, and then we checked if the column is levelled or not. To keep the distance between 2 columns in each corner, we fixed the jigs by using straps. Winter is just around the corner, autumn leaves are colouring the Ruuhveltti (the locomotive)'s background🍁 We might need more clothes next time when we assemble walls🧣















Comentários