top of page

Eastan buttresses are installed!!

28th September 2022

The next our challenge was installing the buttress on top of the bottom wall element. It was heavier and more difficult element to find the middle point to have balance because of the structure but the crane operator found the middle point quite soon and our guiding rope work with teamwork made this work easier💪 The different thing from installing bottom wall element was that there is steel rod extension connection, so we put the steel rods temporally before lifting element and made space for it while lifting. After fixing couplers and steel rods we lowered the whole element and fixed the long bracing. Eastern 2 corners have its buttresses now. If you see VILINÄ from 50 meters away, you can slightly see the whole design already😊
















bottom of page